Change Order Template — Excel & Google Sheets — Document Scope Changes, Get Paid for Extras
STOP eating the cost of "while you're at it." Every scope change gets its own
signed form — priced, dated, and added to your contract total before a single
extra hour is worked. Designed for working contractors.
⭐ HOW IT WORKS
1. Change Order Form — one form per change. Type only in the yellow cells:
project, client, date, CO number, description, and reason. The 8-line cost
table prices itself (qty × rate), and the revised contract total builds
automatically: original contract + approved change orders from your log +
this change.
2. CO Log — every change order from every job in one place, 30 rows. Set the
status (pending / approved / rejected) from the dropdown and the running
approved total updates itself. The form pulls that total in automatically,
so your revised contract number is never stale.
3. Sign it — contractor and client signature lines with dates, right on the
form. Print or save as PDF in two clicks. Duplicate the form tab for each
new change order.
⭐ WHAT'S INSIDE (1 Excel .xlsx file, 3 tabs)
- Change Order Form — project/client/date/CO fields, merged description and
reason areas, 8-line cost breakdown (item, qty, rate, amount), time impact
in added calendar days, original contract amount, auto total of approved
change orders, revised contract total, dual signature lines. Set to print
on one page.
- CO Log — 30 rows: CO number, date, project, description, amount, status
dropdown (pending / approved / rejected), running approved total, plus
auto-counts of approved / pending / rejected.
- Start Here guide — how to use it, the color key, and field-tested tips.
⭐ MADE FOR
General contractors • remodelers • handymen • subcontractors • flippers •
anyone who has ever done "just one small extra" for free
⭐ WORKS IN
Microsoft Excel AND Google Sheets (upload to Drive → Open with Google Sheets).
All formulas open — nothing locked. You only type in the yellow cells.
⭐ PAIRS WITH
Our Contractor Estimate & Bid Calculator and Construction Project Schedule
Template — bid the job, schedule it, and document every change with matching
templates.
⭐ INSTANT DOWNLOAD
No physical item will be shipped. For the purchaser's business use; resale
or redistribution prohibited.
❓ FAQ
Q: Do I need one form per change? — Yes. One signed form per change keeps
the paper trail clean — duplicate the tab for each new one.
Q: What if the client rejects a change? — Log it with status "rejected." The
record protects you if the scope comes up again later.
Q: Does the revised contract total include this change order? — Yes. It adds
original contract + approved change orders from the log + the current form's
total, so the number you show the client is the real number.
Q: I'm not good with spreadsheets — is this for me? — Yes. You only type into
the yellow cells; everything else is automatic.
Q: How do I send it to the client? — Open the Change Order Form tab → File →
Download/Export as PDF, or print it for wet signatures.